Menu

Student Center renderingStudent Center

Mt. SAC’s new student center is set to open in 2022, replacing the one opened in 1953 and designed to serve a much smaller college in a very different era.  The one-story space currently is home to the Student Life Office and Associated Students offices, but has limited group meeting space.

The new 100,000-square-foot building will welcome students into the types of inviting, inclusive, and comfortable places needed to encourage student engagement. The first floor will have a convenience store and an increased number of spaces for students to study either individually or in groups. The second floor of the center will feature a multi-cultural center, a student club kitchen and an updated room for
Associated Students to hold its meetings. The building will also provide
much-needed event space and conference rooms on all three floors.
The facility will be available for the community to use as well with room
for up to 1,000 guests.

(Insert ballot language here)

Status: Under review by the Division of the State Architect
Estimated Budget: $92M 
Schedule: Construction to start Spring 2020

updated 9/9/2019